Holyhead railway station
Holyhead | |
---|---|
Welsh: Caergybi | |
Location | |
Place | Holyhead |
Local authority | Anglesey |
Coordinates | 53°18′29″N 4°37′52″W / 53.308°N 4.631°W / 53.308; -4.631Coordinates: 53°18′29″N 4°37′52″W / 53.308°N 4.631°W / 53.308; -4.631 |
Grid reference | SH247822 |
Operations | |
Station code | HHD |
Managed by | Transport for Wales |
Owned by | Network Rail |
Number of platforms | 3 |
DfT category | E |
Live arrivals/departures, station information and onward connections from National Rail Enquiries | |
Annual rail passenger usage* | |
2012/13 | 0.237 million |
2013/14 | 0.233 million |
2014/15 | 0.235 million |
2015/16 | 0.219 million |
2016/17 | 0.211 million |
History | |
Original company | Chester and Holyhead Railway |
Pre-grouping | London and North Western Railway |
Post-grouping | London, Midland and Scottish Railway |
1 August 1848 (1848-08-01) | First station opened |
15 May 1851 | Station resited |
1 January 1866 | Station resited |
National Rail – UK railway stations | |
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Holyhead from Office of Rail and Road statistics. Methodology may vary year on year. | |
UK Railways portal |
Holyhead railway station (Welsh: Gorsaf reilffordd Caergybi) serves the Welsh town of Holyhead (Welsh: Caergybi) on Holy Island, Anglesey. The station is the western terminus of the North Wales Coast Line 105 1⁄2 miles (170 km) west of Crewe and is managed by Transport for Wales. It connects with the Holyhead Ferry Terminal.
Contents
1 History
2 Facilities
3 Services
4 The Celtic Gateway
5 References
6 Further reading
7 External links
History
The first station in Holyhead was opened by the Chester and Holyhead Railway on 1 August 1848, but this was replaced by the second on 15 May 1851.[1]
The present station was opened by the London and North Western Railway on 17 January 1866[1] and still retains its overall roof. It originally had four platforms, but only three are currently in use, the track to the former platform three having been lifted.
Platform one on the western side of the station, is separated from the other two by the ferry terminal buildings and inner harbour and is the one normally used by Virgin Trains services to London Euston. Most Transport for Wales DMU services use platform two. Platform three is outside the train shed and is used by the early morning Premier Service to Cardiff Central, plus a few other trains at busy periods. There are carriage sidings and servicing facilities alongside platform one, whilst platform three also has an engine release line & run-round loop available.
A rail-served container terminal next to the station closed in 1991 when the traffic transferred to Liverpool.[2] It has since been demolished and is now used as a car parking area for the Stena Line ferry service.[3]
Passenger ships previously used to berth in the inner harbour next to Platform 1, this ceased when the port was re-developed. Stena Line built an administration building between platforms 1 and 2 in the early 1990s.
Facilities
The station is fully staffed, with a ticket office in the main ferry terminal - this is manned seven days per week (06:10-19:10 Mondays to Saturdays, 10:30-17:30 Sundays). Self-service ticket machines are also provided for use outside these times and for collecting pre-paid tickets. The terminal also offers covered waiting accommodation, a payphone, a photo booth, left luggage office, toilets, shops and a cafe. Train running details are offered via digital information screens, timetable posters and automated announcements. Step-free access is available to all platforms.[4]
Services
Holyhead is served by a basic Transport for Wales hourly service throughout the week (although less frequently on winter Sundays) to Shrewsbury with services continuing to Birmingham International and Cardiff Central on alternate hours. Two services operate to & from Manchester Piccadilly on weekdays only. Most Sunday services run to/from Crewe.[5]
Virgin Trains operate services to London Euston via the West Coast Main Line, with six departures and five arrivals from London Euston on weekdays, with a sixth arrival from Birmingham New Street, four services to and from London Euston on Saturdays and four departures and three arrivals from Euston on Sundays, with the fourth arrival originating at Crewe.
Holyhead station adjoins the Holyhead Ferry Port, with sailings to both Dublin and, until September 2014, to Dún Laoghaire. It is connected to the town centre by a steel pedestrian/cycle bridge named The Celtic Gateway.
The Celtic Gateway
The Celtic Gateway (Welsh: Porth Celtaidd) is a stainless steel pedestrian and cycle bridge located in Anglesey, Wales. Opened on 19 October 2006 by Andrew Davies AM[6] to connect Holyhead's railway station and ferry terminal with the town centre,[7]
References
^ ab Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. p. 122. ISBN 1-85260-508-1. R508..mw-parser-output cite.citation{font-style:inherit}.mw-parser-output q{quotes:"""""""'""'"}.mw-parser-output code.cs1-code{color:inherit;background:inherit;border:inherit;padding:inherit}.mw-parser-output .cs1-lock-free a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-lock-limited a,.mw-parser-output .cs1-lock-registration a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-lock-subscription a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration{color:#555}.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration span{border-bottom:1px dotted;cursor:help}.mw-parser-output .cs1-hidden-error{display:none;font-size:100%}.mw-parser-output .cs1-visible-error{font-size:100%}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-format{font-size:95%}.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-left{padding-left:0.2em}.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-right{padding-right:0.2em}
^ Holyhead, 23 December 1980 www.2D53.co.uk; Retrieved 2013-08-05
^ Freightliners to Holyhead 1971 - 1991 www.penmorfa.com; Retrieved 2013-08-05
^ Holyhead station facilities National Rail Enquiries; Retrieved 14 March 2017
^ GB eNRT December 2016 Edition, Table 81
^ Info from the Holy Island website Archived 18 October 2014 at the Wayback Machine.
^ Info on the bridge and site Archived 22 October 2014 at the Wayback Machine.
Further reading
Mitchell, Vic; Smith, Keith (2011). Bangor to Holyhead. West Sussex: Middleton Press. figs. 61-78. ISBN 9781908174017. OCLC 795179106.
Allen, David (21 October – 3 November 1998). "Seaside signalling in North Wales". RAIL. No. 342. EMAP Apex Publications. pp. 40–42. ISSN 0953-4563. OCLC 49953699.
"Holyhead station's £3m repairs on schedule". RAIL. No. 343. EMAP Apex Publications. 4–17 November 1998. p. 11. ISSN 0953-4563. OCLC 49953699.
External links
Wikimedia Commons has media related to Holyhead railway station. |
Train times and station information for Holyhead railway station from National Rail
Preceding station | | National Rail | | Following station |
---|---|---|---|---|
Valley | Transport for Wales North Wales Coast Line | Terminus | ||
Bangor (Gwynedd) | Transport for Wales North-South "Premier" service | Terminus | ||
Bangor | Virgin Trains London Euston-Holyhead | Terminus | ||
| Ferry services | | ||
Terminus | | Irish Ferries Ferry | | Dublin Port |
Terminus | | Irish Ferries high-speed catamaran | | Dublin Port |
Terminus | | Stena Line Ferry | | Dublin Port |